New take on stimulations to maximize asset value - Eagle Ford

The operator completed its early wells with 17-stage sliding sleeve/frac valve systems with 5 1/2-in. cemented casing, using 20/40-mesh premium white sand proppant. Although the targets, as well as the completion and stimulation designs, were identical, production from the first four wells varied as much as 135%. The transition to various iterations of plug and perf completions resulted in equally mixed results, further reinforcing that factors other than completion types obviously influenced maximum reservoir drainage. 

Read full case history to learn about how STRATEGEN improved production rates in the Eagle Ford. 